This site uses cookies. Some cookies are essential to ensure our website works for you in the best possible way. You may delete and block all cookies from this site, but parts of the site may not work. To find out more about cookies on this website and how to delete cookies, click here to see our cookie statement.

Close
Reina Group Heating and Plumbing Case Studies

Heating and Plumbing Case Studies

Client: Lovell Partnerships
Year: 2016 / 17
Site: Trinity Walk (phase 1) Woolwich
Description:

A tricky regeneration project comprising of 332 new build apartments, designed and installed over an unbelievable 9 months only. This is phase 1 of a total build of 1500 new homes. Within the current phase there is a mixture of private and affordable units, with a high mechanical specification over 9 blocks, up to 9 stories in height. A team of 35 plumbers, storeman, labourers, site supervisors and contracts managers have delivered this project and Reina Group to new heights.

System Design:
Danfoss HIU (heat interface) units as main heat distribution source - Vent Axia MVHR with enhanced summer bypass for cooling. 
 
Reina Group Scope of Works:
Mechanical design; heating and plumbing installation:  Danfoss heat interface units - Gas boilers to the town houses. Traditional radiators with TRV's throughout with weather compensation. Full sanitaryware installation, Mechanical ventilation with heat recovery. 
 
Client: Jenner Group
Year: 2017
Site: Hythe Imperial Green
Description:

Imperial Green is a private development of 75 modern, high quality town houses and apartments situated in the coastal town of Hythe. These stylish homes are located in the landscaped grounds, of the historic 19th Century, Hythe Imperial Hotel & Spa, the development is adjacent to a nine-hole golf course and overlooks a wide promenade and pebbled beach. 

System Design:

Vaillant combination boilers installation to the flats and Vaillant system boilers coupled with an unvented hot water cylinder for hot water delivery. Underfloor heating to ground floors with traditional radiators and  TRV’s throughout the scheme, with weather compensation

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; gas and water service risers and rainwater pipe installation.

Client: Balfour Beatty Construction
Year: 2015
Site: Winterfield and Stepstile Redevelopment East Malling Kent
Description:

A development of 74 units by Balfour Beatty on behalf of Russet Homes. A mixed development of social housing comprising  of one & two bed flats within two tower blocks and 3 & 4 bedroomed housing, all which met  code level 3.

System Design:

Vaillant combination boilers installation to the flats and Vaillant system boilers coupled with an unvented hot water cylinder for hot water delivery. With Traditional radiators and  TRV’s throughout the scheme, with weather compensation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; Gas and Water service risers and rainwater pipe installation.

East Malling hating and plumbing works
Client: Newcourt Construction
Year: 2017
Site: Wadhurst College, East Sussex
Description:

A luxury collection of 26 large family homes set amongst 18 acres of breathtaking surrounds. By merging local architectural influences with the stunning countryside, this private gated parkland development will be truly unique, providing high quality living at its best.

System Design:

Vaillant EcoTec Boiler, 300 litre Magaflow Eco cylinder. Underfloor heating throughout- Special interest in the system method of installing the underfloor heating from below the floor level to 1st floor. Extremly high specification for Sanitaryware Installation.

Reina Group Scope of Works:

Design Instllation of the complete mechancial, plumbing and heating systems.

Client: Orbit Homes
Year: 2017
Site: Kiln View-Peters Village Rochester
Description:

This new community consists of 86 traditionally styled modern homes comprising of 43 Private Sale, 43 Rent/Shared Ownership, that are built to withstand the daily rigours of modern life and designed to provide a durable, contemporary and comfortable properties. Offering three and four bedroom family houses and two bedroom apartments.

System Design:

Mechanical design; heating and plumbing installation with Vaillant Home combination boilers installed into the flats and Ideal Logic system boilers coupled with an unvented hot water cylinder installed into the houses; Traditional radiators with TRV's throughout with weather compensation: Full sanitaryware installation; Gas and Water main service risers with complete rainwater pipe installation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; mechanical ventilation heat recovery installation and rainwater and gutter installation.

Client: Weston Homes
Year: 2015
Site: Swale Park, Whitstable, Kent
Description:

Phase 1: 27 town houses. Phase 2: 94 one and two bedroom luxury apartments

Nibe heat pumps with integrated hot water cylinders to all house type units

System Design:

Nibe Heat pumps with intergrated hot water cylinders to all houses. Ideal logic 33kW boilers.Traditional radiators with TRV’s throughout the scheme, with weather compensation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; Gas and Water service risers and rainwater pipe installation.

swale park heating and plumbing work
Client: Jenner Group
Year: 2016
Site: Tavistock Road Croydon Greater London
Description:

A social development of 35 units spread over 2 tower blocks in Croydon, Greater London

System Design:

Vaillant EcoTec combination boilers with Traditional radiators and  TRV’s throughout the scheme, with weather compensation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; Gas and Water main service risers and rainwater pipe installation. Mechanical ventillation with heat recovery.

london heating and plumbing work
Client: Lovell Partnerships
Year: 2017-18
Site: Lymington Fields Dagenham Greater London
Description:

A mixed development of 273 units. Both private/social houses and apartments.

System Design:

Potterton Promax combination boilers installation to the flats and Baxi Ecoblue system boilers coupled with an unvented hot water cylinder for hot water delivery to houses. 

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation with Potterton Promax combination boilers to the flats and Baxi Ecoblue system boilers coupled with an unvented hot water cylinder to the houses; Traditional radiators with TRV's throughout with weather compensation: Full sanitaryware installation; Gas and Water main service risers with complete rainwater pipe installation.

Lymington Fields Dagenham Greater London heating and plumbing installation
Client: Main Contractor for Orbit Homes
Year:
Site: Albany Drive, Herne Bay
Description:

A mixed development of 16 flats and built to Code for Sustainable Homes Level 3.

System Design:

Vaillant combination boilers installation to the flats and Vaillant system boilers coupled with an unvented hot water cylinder for hot water delivery. Traditional radiators with TRV’s throughout the scheme, with weather compensation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; mechanical ventilation heat recovery installation and rainwater pipe installation.

Client: Orbit Homes (Developments)
Year: 2016
Site: Chilham Kent
Description:

A development of 40 number 2 and 3 bedroom houses for Orbit Homes

System Design:

Heating delivered via Alpha InTec 34C combination boiler with Alpha gas saver top box. Hot water via Solar Thermal , SolarSmart system and Cylinder

Reina Group Scope of Works:

Mechanical design; Solar Thermal hot water. Central heating and plumbing installation; sanitaryware installation; and rainwater pipe installation.

Chillham, Kent heating and plumbing works
Client: Weston Homes
Year:
Site: Bartons Mews, Whitstable, Kent
Description:

10 number 3 storey town houses with 4 apartments above a retail unit

System Design:

Ideal logic 33kW boilers.Traditional radiators with TRV’s throughout the scheme, with weather compensation.

Reina Group Scope of Works:

Mechanical design; heating and plumbing installation; sanitaryware installation; Gas and Water service risers and rainwater pipe installation.

barton mews heating and plumbing work
Client: Main Contractor for English Rural Housing Association
Year:
Site: Callend, Smeeth
Description:

Located in the village of Smeeth, the rural development consisted of 11 dwellings of 7 houses and 4 flats, built to Eco Homes Very Good standard.

System Design:

Traditional wet central heating system using standard radiators. The hot water was integrated with a solar thermal roof panel system. The hot water is stored within a 250 litre unvented insulated cylinder.

Reina Group Scope of Works:

Heating and plumbing design, including installation; rainwater design and installation.

Client: Main Contractor for Hyde Housing Association
Year:
Site: Cheriton Road, Folkestone
Description:

The project comprised of the construction of one block of eighteen flats and one bungalow on a vacant brown field site, built to Eco Homes excellence standards.

System Design:

A purpose design heating system contained within a single block, Gas fed via Trac pipe to individual combination boilers.

Reina Group Scope of Works:

Heating and plumbing design, including installation; rainwater design and installation.

Client: Main Contractor for Town and Country Housing Association
Year:
Site: East Fields, Folkestone
Description:

This new build residential development comprised a combination of 37 houses and flats together with associated external works, services and drainage on a former gas holder site. The scheme achieved Code for Sustainable Homes level 3.

System Design:

The houses consisted of Heat King air source heat pump linked to a 210 litre unvented cylinder.  The flats consisted of an Alpha Condensing combination boiler fitted with the Zenex Gas Saver flue recovery system.

Reina Group Scope of Works:

Heating and plumbing design; rainwater design/installation and sanitary-ware installation.
 

Client: Main Contractor for Accent Peerless
Year:
Site: Eastern Esplanade, Margate
Description:

The scheme comprised of 140 flats, with 40 shared ownership units, 40 affordable rent units and 60 for sale units. The construction of the u-shaped layout of the buildings was
pre-insulated timber frame with a masonry façade.

System Design:

Electric heating throughout with 210 litre direct unvented cylinders.  

Reina Group Scope of Works:

Rainwater design/installation and sanitary-ware installation

Client: Main Contractor for Canterbury City Council
Year:
Site: Ellen Court, Littlebourne, near Canterbury
Description:

Demolition of the existing 1973 sheltered housing scheme to provide 5 flats and 26 bedsits with shared facilities and construction of replacement scheme of 8 two-bed flats, 7 one-bed bungalows and common room. The homes are built to achieve code level 4 of the code for sustainable homes.

System Design:

Vaillant combination boilers with under-floor heating; weather compensation and mechanical ventilation with heat recovery.  

Reina Group Scope of Works:

Mechanical design; UFH design and installation; plumbing and heating installation; sanitaryware installation and mechanical ventilation and heat recovery installation.  

Client: Main Contractor for Accent Peerless
Year:
Site: Rendezvous Street, Folkestone
Description:

This new build residential development, located in Rendezvous Street in the centre of Folkestone, the development comprised of 7 one-bedroom and 11 two-bedroom apartments.

System Design:

Electric heating throughout with 210 litre direct unvented cylinders. Design and installation of car park underground drainage system. 

Reina Group Scope of Works:

Rainwater design/installation and sanitary-ware installation.

Client: Domestic Client
Year:
Site: The Pantiles, Canterbury
Description:

A 400m2, three storey state of the art dwelling, built to modern methods of construction, which included an indoor heated pool.

System Design:

The main part of the dwelling is fitted with a Nibe Fighter 1330 22kW ground source heat pump, which draws energy via a 6 x 100m bore-hole matrix.
The energy sourced from the ground is stored within a 200 litre buffer vessel for heating distribution, within a under floor heating system, set in the floor screed to the ground and first floor. The second floor benefits from an Uponor Unipipe system 12 (15mm floating floor panels combining a 12mm pipe due to height restrictions). The hot water is provided via a 500 litre VPAS cylinder linked to solar collectors.

A Mechanical Ventilation with Heat Recovery (MVHR) system was installed throughout, which complemented the designed low air permeability of the building. The MVHR system incorporated comfort cooling to all bedrooms, which utilised an existing ducting system.

The Swimming Pool is heated continually by an additional Nibe Fighter 22kW ground source heat pump, which draws energy from 6 x100 meter bore holes. This energy is then distributed to a 200litre buffer. 

Reina Group Scope of Works:

Mechanical Design; UFH Design & Installation; heating and plumbing installation; sanitaryware installation; electrical control wiring; mechanical ventilation and heat recovery installation; borehole header pipe-work and external manifold installation.

Client: Main Contractor for Town and Country Housing Association
Year:
Site: Wellesley Road, Ashford
Description:

This new build residential development, located in Rendezvous Street in the centre of Folkestone, comprised of 7 one-bedroom and 11 two-bedroom apartments.

System Design:

Electric heating throughout with 210 litre direct unvented cylinders. Design and installation of car park underground drainage system.

Reina Group Scope of Works:

Mechanical design and installation.